Skip to content
Menu

Technology and agencies

“Let's leave that for later” gets recorded too, with who said it.

Scope disputes usually start with a remark in a demo that nobody wrote down. Nominute records the sprint review, links each in-or-out decision to the sentence the client said, and produces the English client copy from the team's internal notes.

Illustrative scenario

A software company of about 80 people in Đà Nẵng, building products for clients in Australia and the United States. Each project has a sprint review with the client every two weeks; the team talks among itself in Vietnamese mixed with English terms.

The organisation, people, figures and documents on this page are fictitious and show how the product is used. They are not Nominute customers or measured results.

Who meets, and how often

  • Sprint review and demo

    Every two weeks, per project

    Client product owner, PM, tech lead: feedback per feature, decisions on what goes in and what waits.

  • Requirements sessions

    Weekly

    BA and client; what is agreed must become a requirement with acceptance criteria.

  • Change request meetings

    When scope moves

    Cost and schedule impact; you need evidence the client agreed.

  • Internal standups and retros

    Daily and fortnightly

    Short and internal; rarely need formal minutes.

How minutes get written today

The PM runs the meeting while taking notes in the project wiki, then writes an English summary email to the client and creates tickets for the team. The internal note (estimates, risks, observations) and the client email are different documents, written twice.

  1. 01Client feedback from the demo is only partly remembered; tickets lack acceptance criteria.
  2. 02When the client says “let's leave that for later”, nobody writes it down, and at acceptance it becomes a scope argument.
  3. 03The English summary email is written from scratch after every session.
  4. 04Internal content such as estimates or staffing risks sometimes slips into the client email.

A typical meeting with Nominute

Sprint review with an Australian client · 60 minutes · PM, tech lead, BA and 2 client participants · English, with internal asides in Vietnamese

  1. 01Before

    A sprint review template

    The PM creates the meeting in the client's project with the sprint review template: features demoed, feedback, scope decisions, actions. Product names, module names and ticket keys are in the project glossary.

    Features used:

    • Template per meeting type
    • Company glossary
  2. 02During

    Recorded in the browser

    The team sits in a meeting room and the client joins online through the room speaker; the PM records straight from the browser. The transcript is split by speaker and handles both the English and the team's Vietnamese asides.

    Features used:

    • Browser recording
    • Mixed Vietnamese and English
    • Speaker separation
  3. 03After

    Feedback becomes actions

    The draft records feedback per feature, what goes in and what waits, and actions with owners and due dates. Every scope decision links to the sentence the client said.

    Features used:

    • Actions with owner and due date
    • Traceable sources
  4. 04Approval

    Internal note and client copy

    The PM keeps the internal note, creates the client copy with one instruction, reviews every passage removed or reworded, then translates the approved version into English.

    Features used:

    • Internal and client versions
    • Translation
    • Approval and time stamp
  5. 05Send and file

    The client confirms, the team gets its work

    The client receives a link and confirms the minutes; the PM sees who has opened and who has confirmed. Each engineer receives an email with their actions first.

    Features used:

    • Recipients confirm minutes
    • Per-person emails

The industry's minutes template

An administrator builds the template once, or uploads the Word file already in use. Every meeting of that type then produces the same document.

Sprint review minutes: Features demoed, Client feedback, Scope decisions, Actions. No. ATL-SR-14.
Minutes template · Sprint review minutes

Default for

Sprint reviews and client demos

Document number

{project}-SR-{seq}

Next number: ATL-SR-15

Sections · 4

  1. IFeatures demoed
  2. IIClient feedback
  3. IIIScope decisions
  4. IVActions

Signature block

CLIENT CONFIRMATION · PROJECT MANAGER

Checked by the template

  • Feedback recorded per feature demoed.
  • In-or-out decisions link to the client's own words.
  • Every action has an owner and a due date.
  • No internal estimates in the client copy.

Preview · A4

ABC SOFTWARE JOINT STOCK COMPANY

Project Atlas · Client: XYZ Pty Ltd

No. ATL-SR-14

Đà Nẵng, 20 November 2026

SPRINT REVIEW MINUTES

Sprint 14 · 9–20 November 2026

Time:
15:00–16:00, 20 November 2026 · 5th-floor meeting room and online
Client:
Sarah Mitchell (Product Owner), Tom Nguyen (Engineering Manager)
Team:
Võ Thành Đạt (PM), Lê Minh Trí (Tech lead), Phan Thu Uyên (BA)

I. Features demoed

Single sign-on with company accounts; PDF report export; branch filter.00:05:10

II. Client feedback

The branch filter needs to allow several branches at once.00:22:40

PDF report accepted with no further changes.00:31:05

III. Scope decisions

Excel export moves to sprint 16 and is out of scope for sprint 15.00:38:20

IV. Actions

Add multi-branch selection to the filter: Lê Minh Trí, by 27 November 2026.00:24:15

Update acceptance criteria for ATL-212: Phan Thu Uyên, by 24 November 2026.00:25:02

The client confirms these minutes through the share link.

CLIENT CONFIRMATION

(Signature and full name)

Sarah Mitchell

PROJECT MANAGER

(Signature and full name)

Võ Thành Đạt

Minutes drafted with Claude

In the product

In the product

The team's notes and the client's minutes

The internal note carries real estimates and staffing risks; the client minutes do not. The PM makes the client copy with one instruction, sees every passage removed or reworded, then translates and sends it.

Left, the internal sprint review note with an estimate and a staffing risk; right, the client copy with the internal lines struck out and replaced by formal sentences.

In the product

Each engineer's actions, with their source

Every action has an owner, a due date and the passage where it was assigned, so the ticket carries its context. An unassigned action is flagged. Pushing actions to Jira and Asana is in development; today each person gets an email with their own actions.

Four actions from sprint review 14, each with owner, due date and timecode; one flagged as unassigned. Below, the email to the tech lead and the integrations in development.

Compliance and security

Legal notes here are for orientation and are not legal advice. Nominute is a drafting tool; responsibility for the content of the minutes stays with the signatories.

  • Client confidentiality

    Meetings may touch on system architecture or client data. Each project has its own access list; administrators can forbid public links and cap how long links last. Meeting content is never used to train models.

  • Ask the client before recording

    Many software development contracts address recording and where data is stored. Ask the client before the first meeting; Nominute stores data in Singapore.

  • Evidence of scope

    “Later” and “not doing it” decisions link to the client's exact words, and the client confirms the minutes through the link. Version history shows what changed after sending.

  • Staff accounts

    Administrators can require sign-in with the company's Google Workspace or Microsoft 365 accounts, and revoke accounts when people leave while keeping the history.

  • Integrations

    Pushing actions to Jira and Asana and sending minutes to Slack and Teams are in development. Today, actions go out by email and appear in the PDF and Word minutes.

Time estimate, with the arithmetic

This is a calculation from the assumptions stated below, not a result measured at any organisation. Replace them with your own numbers.

10 client meetings a month across 2 projects: sprint reviews and requirements sessions

Today, per meeting

Write the internal note30 min
Write the English summary email to the client35 min
Create tickets and assign work from the notes25 min
Total90 min

With Nominute, per meeting

Review the draft and scope decisions15 min
Approve the client copy made with one instruction10 min
Create tickets from the existing action list10 min
Total35 min
Difference per meeting
90 − 35 = 55 min
Per month
10 meetings × 55 min = 550 min, about 9.2 hours

Assumptions

  • Each meeting lasts 45–60 minutes.
  • Internal standups and retros are not included.
  • Tickets are still created by hand until the Jira and Asana integrations ship.
  • Today's times are assumptions for one PM, not measured at any particular company.

Recommended plan

Business

4 seats × 200,000 ₫ = 800,000 ₫ per month, before VAT

Business includes company-branded templates, the approval workflow, projects per client and the activity log. A PM working alone can start with Pro.

Who holds a seat

Two PMs, one BA and the head of delivery (approver). Clients read and confirm through links; engineers receive their actions by email.

Other industries

All solutions

Questions

Can actions go to Jira?

That integration is in development. Today, actions have an owner and a due date, are emailed to each person and appear in the PDF and Word minutes.

What about fully online meetings?

Upload the platform's recording after the meeting; Nominute transcribes it and drafts the minutes just as with a room recording. Joining Zoom, Google Meet and Teams automatically is on the roadmap.

Our team mixes Vietnamese and English. Does that work?

Yes. It is exactly what Nominute was built for: Vietnamese sentences full of technical terms, module names and product names. The project glossary helps with proper names.

Does the client need an account?

No. The client opens the link with an invited email, reads it, and confirms or sends comments.

Should we use it for daily standups?

You can, but standups rarely need formal minutes. Nominute is most useful in meetings where the client makes decisions.

Try it on a real meeting of your own.